Case Study: Co-Locating Electrolysis With Wind Projects

  • A behind the scenes look a wind project that has deployed electrolysis to produce green hydrogen, either to generate revenue or to compensate for low generation
  • Analysing the challenges of offshore wind hydrogen generations including transportation to the mainland, as well as potential technology such as desalinisation to use water
  • Examining how developers have secured offtake for their projects, and how those relationships were built and nurtured